Burnsville High School

Location: Burnsville High School Burnsville, MN

Size: 20,000 square feet

Product: Epoxy Terrazzo

The Burnsville High School is an example of Grazzini’s ability to complete large jobs in a short period of time. The actual renovation of the school was complicated by the school’s need to stay open during the school year. This caused contractors to complete and condense their work during the summer season. Before work on the floor could begin, the existing flooring had to be removed by Grazzini workers. A completely new epoxy terrazzo flooring system was specified primarily for its durability. An added benefit to the system was its flexible design capabilities. The school selected emblems and monikers that represented its colors and icons. The new flooring provides a fresh updated look that is full of school spirit.

 

   
All Content © 2004 Grazzini Brothers & Company